As Constructed Surveys

This type of survey has several applications, including monitoring the progress of a large project and ensuring that discrepancies are picked up along the way. Wall positions, drainage run positions, floor levels, anything that is critical in its position or level datum to the overall construction.

Other applications include highways and drainage surveys for housing developers. These form part of an agreement between developer and local authority and are a final record of construction. Two common types of agreements are a ‘section 104’ agreement, formed between developer and local water authority and a ‘section 38’ agreement, entered into by developer and the local council responsible for the maintenance of highways.

Accurate surveys are drawn and coloured corresponding to the agreements.

Example Downloads

Below are some examples of our As Constructed Surveys, click an image to open.

As Constructed Example 1
As Constructed Example 2
As Constructed Example 3